Lower Manhattan in the mid-2000s was still recalibrating. The Financial District had lost its daytime population and had not yet become the neighborhood it is today. The site on Spruce Street, just east of City Hall Park and beside the Woolworth Building, was a parking lot. Forest City Ratner and developer Bruce Ratner commissioned Frank Gehry for what would become his first skyscraper, a 76-story mixed-use tower with 899 apartments, a public school, medical offices, and retail at its base. When it opened in 2011, at 870 feet it was the tallest residential tower in the Western Hemisphere. The New York Times called it the finest skyscraper to rise in New York since Saarinen’s CBS Building.
The design direction arrived the way Frank’s directions often did, obliquely. He had just returned from traveling, had been looking at Bernini, and wanted to know if we understood the difference between Bernini folds and Michelangelo folds. Michelangelo’s drapery is structural, heavy, gravitational. Bernini’s is kinetic, light, seemingly in motion. The facade needed to read like the latter. That distinction guided everything that followed.
Translating that direction into a buildable curtain wall meant navigating the facade contractor directly. Those meetings, presenting the geometry, fielding pushback on complexity, were usually just me and the engineers, Frank rarely in the room. The contractor’s position was consistent: too much variation, simplify the design. The response was equally consistent: adjust where necessary, protect the vision everywhere else. There was a moment, mid-negotiation, when Frank walked past the library where one of those sessions was happening. He paused, looked in, asked how it was going. I told him we were going back and forth with the facade contractor about what was buildable. He said, “This is the most important building of my career. Don’t f--- it up.” Then walked away. The engineers fell into alignment shortly after.
Carrying that compositional logic from Frank’s physical models into a buildable tower required technology the architecture industry had not yet widely adopted. CATIA, the aerospace-grade parametric software developed by Dassault Systèmes, was the tool that made it possible. At Gehry Partners, it had been pioneered precisely for this reason: to realize designs that could be conceived by hand but not documented or built without computational precision. That was the philosophy too, the computer as a tool to manifest a vision, not to generate one. The design happened in the model shop. CATIA was how it survived contact with fabricators, structural engineers, and construction. Working in it across three and a half years on this project built a fluency that became the foundation for much of what followed. At ZHA, it remained a specialized tool, respected but not widely adopted. Every building I delivered there was built in it.